|
On the right side of the meter there are three input ports. The top port is
for connection with the sensor, the second is for the RS232 communications
connections, and the third is for the power connection. To set up the
meter/sensor system, connect the sensor to the meter and then turn the meters
power on. The power cord is only necessary to charge/recharge the battery. The
power switch is located on the left side of the meter.
Connection Port

|
|